Office Renovation in Lahore

Modernize an occupied office without losing sight of people, productivity or the working day. Woodex plans the upgrade around what can stay, what must change and when each zone can be released.

Itemized BOQTrade-by-trade clarityPhased deliveryLower disruptionExisting spacesUpgrade, not first build
Contemporary office interior representing a phased Woodex office renovation
Reconfigured work zones, refreshed finishes and coordinated services

What the scope can include

A condition survey decides what should be retained, repaired or replaced.

Built around an operating workplaceDepartment-by-department phasing keeps teams moving while the new office takes shape.
01Workspace reconfigurationRebalance desks, meeting rooms, circulation and support areas around the current team.
02Office modernizationRefresh dated interiors with new ceilings, lighting, flooring and finishes.
03Expansion planningConnect added space to the existing office with consistent services and circulation.
04Department upgradesRenovate one team zone at a time while the rest of the workplace stays active.
05Executive areasUpgrade private offices, meeting rooms and client-facing spaces.
06Furniture and joineryCoordinate workstations, storage, counters and custom-built elements.

A process shaped for office renovation

Survey, scope, BOQ and phasing are agreed before disruptive work starts.

01

Workplace audit

Measure the office, map services and identify what can be retained.

02

Occupancy plan

Agree working hours, temporary moves and the order of each zone.

03

Design and BOQ

Resolve layouts, finishes and an itemized trade-by-trade cost plan.

04

Phased execution

Complete noisy work and shutdowns outside agreed operating windows.

05

Handover by zone

Snag, clean and return each completed area to the team.

Indicative renovation pricing

These planning ranges come from comparable Woodex renovation scopes. The exact quote follows a site survey.

Price varies with condition, materials, services, size and the number of delivery phases.

Request a survey + BOQ
1,000 sq. ft. officePKR 1.5M–3.5M
Focused room or departmentPKR 400K–1.5M

Choose the right starting point

Renovation improves an existing space. Fit-out creates a finished space from a shell, while interior design resolves the plan and 3D direction.

This page

Renovation

Survey, repair, upgrade and phased delivery for a space that already exists.

Design + build

Fit-Out

Complete a shell or unfinished space for first occupation.

Explore Fit-Out
Design + 3D

Interior Design

Resolve layouts, materials, lighting and visualization before build.

Explore Interior Design

Office Renovation FAQs

Six practical answers before survey, costing and site work.

Often, yes. We phase work by department, floor or operating hours and agree temporary access before site work begins.

Yes. We can change workstations, meeting rooms, partitions, lighting, power and circulation around the existing shell.

Yes. The BOQ separates rooms, trades, quantities and materials before execution.

A focused upgrade may take one to three weeks. Larger occupied offices depend on the number of phases and allowed working hours.

It can be. Woodex can coordinate new workstations, storage, counters and joinery within the renovation scope.

Choose renovation for an existing workplace. Choose fit-out when a shell or unfinished office needs design and construction for first use.

Talk to Woodex

Tell us the office area, team size, current condition and whether the workplace must remain operational.

Studio
M-71, Zainab Tower, Model Town Link Road, Lahore
HoursMon–Sat 9:30–6:30

Why Woodex

One accountable team from brief to handover

Architecture, interiors, fit-out, renovation, 3D and custom furniture, all from one Lahore studio since 2016.

  • 200+ completed spacesHomes, offices, retail and hospitality across Pakistan.
  • In-house 3D studioSee the space in photoreal detail before work begins.
  • Own furniture workshopKitchens, wardrobes and joinery made to the drawing.
  • Clear programmeQuantities, phasing and handover dates agreed up front.