Skip to content

Healthcare Renovation in Lahore

Upgrade a working clinic, laboratory, pharmacy or diagnostic space with hygiene, patient flow and continuity of service at the centre of the plan.

Itemized BOQTrade-by-trade clarityPhased deliveryLower disruptionExisting spacesUpgrade, not first build
Calm modern clinic reception representing healthcare renovation
Easy-care finishes, clear patient flow and controlled phasing

What the scope can include

A condition survey decides what should be retained, repaired or replaced.

Care continues during the workHygiene-first materials and carefully released zones support a safer phased renovation.
01Clinic refurbishmentUpdate reception, waiting, consultation and treatment spaces.
02Pharmacy renovationImprove dispensing, counters, storage, customer flow and display.
03Laboratory upgradesCoordinate worktops, services, equipment positions and easy-clean surfaces.
04Diagnostic centre worksReplan patient movement, procedure rooms and support areas.
05Hygiene-focused finishesSpecify durable, cleanable and low-maintenance materials by zone.
06Building services coordinationPlan lighting, power, plumbing, ventilation and specialist equipment interfaces.

A process shaped for healthcare renovation

Survey, scope, BOQ and phasing are agreed before disruptive work starts.

01

Clinical audit

Map patient flow, active rooms, equipment and hygiene controls.

02

Service continuity plan

Agree isolation, temporary routes and rooms that must remain active.

03

Design and approvals input

Coordinate the renovation package; the client retains responsibility for formal regulatory approvals.

04

BOQ and protected execution

Price each zone, isolate work areas and control dust and access.

05

Testing and handover

Clean, inspect and return each completed area to service.

Indicative renovation pricing

These planning ranges come from comparable Woodex renovation scopes. The exact quote follows a site survey.

Price varies with condition, materials, services, size and the number of delivery phases.

Request a survey + BOQ
1,000 sq. ft. healthcare spacePKR 2.5M–5M+
Focused room or zonePKR 400K–1.5M

Choose the right starting point

Renovation improves an existing space. Fit-out creates a finished space from a shell, while interior design resolves the plan and 3D direction.

This page

Renovation

Survey, repair, upgrade and phased delivery for a space that already exists.

Design + build

Fit-Out

Complete a shell or unfinished space for first occupation.

Explore Fit-Out
Design + 3D

Interior Design

Resolve layouts, materials, lighting and visualization before build.

Explore Interior Design

Healthcare Renovation FAQs

Six practical answers before survey, costing and site work.

Often, yes. We phase rooms, protect routes and agree infection-control measures with the client before work starts.

We prioritise durable, easy-clean finishes appropriate to each room, with slip resistance and maintenance considered early.

Woodex coordinates the design and renovation information, but the client remains responsible for formal regulatory and clinical approvals.

Yes. We coordinate counters, storage, equipment positions, services and circulation for these spaces.

Timing depends on the number of active rooms, service shutdowns and hygiene controls. The phased programme is agreed before execution.

Yes. Rooms, finishes, services and specialist coordination can be separated clearly in the BOQ.

Talk to Woodex

Share the facility type, active rooms, equipment needs and any service-continuity restrictions.

Studio
M-71, Zainab Tower, Model Town Link Road, Lahore
HoursMon–Sat 9:30–6:30

Why Woodex

One accountable team from brief to handover

Architecture, interiors, fit-out, renovation, 3D and custom furniture, all from one Lahore studio since 2016.

  • 200+ completed spacesHomes, offices, retail and hospitality across Pakistan.
  • In-house 3D studioSee the space in photoreal detail before work begins.
  • Own furniture workshopKitchens, wardrobes and joinery made to the drawing.
  • Clear programmeQuantities, phasing and handover dates agreed up front.